| 184 | 6 | 171 |
| 下载次数 | 被引频次 | 阅读次数 |
针对基坑变形的特点,在GM(1,1)模型的建模原理上建立了反向累加灰色模型。结合反向累加序列的建模特点,提出了一种对积分参数c、初始值以及背景值同时进行优化的GOM(1,1)模型。通过实例验证了本文提出的改进后的GOM(1,1)模型能够提高基坑变形的预测精度,验证了该方法的有效性和实用性。
Abstract:In order to improve the accuracy of foundation pit settlement prediction,the paper,according to the characteristics of foundation pit deformation,builds reverse accumulative gray model based on the GM(1,1)model. Combined with characteristics of accumulative sequences in opposite-direction,the paper puts forward a kind of GOM(1,1)model whose integral parameter,initial value and background value are optimized at the same time,to improve the prediction results. In the end,an application is given to demonstrate that the optimized GOM(1,1)model can improve the prediction precision of the foundation pit deformation,which proves the practicability and effectiveness of the optimized model.
[1]黄声享,尹晖,蒋征.变形监测数据处理[M].武汉:武汉大学出版社,2010
[2]宋中民,邓聚龙.反向累加生成及灰色GOM(1,1)模型[J].系统工程,2001,19(1):66-69
[3]徐进军,王海城,刘卫平.反向灰色模型中积分参数确定方法[J].测绘通报,2013(S1):108-110
[4]徐进军,王海城,刘卫平.灰色模型GM(1,1)中积分参数的确定[J].测绘地理信息,2014,39(2):6-8
[5]王正新,党耀国,刘思峰.基于离散指数函数优化的GM(1,1)模型[J].系统工程理论与实践,2008,28(2):61-67
[6]黄传胜,张家生.深基坑开挖变形的灰色马尔科夫链预测方法[J].铁道科学与工程学报,2011,8(2):71-75
[7]李伟,袁亚南,牛东晓.基于缓冲算子和时间响应函数优化灰色模型的中长期负荷预测[J].电力系统保护与控制,2011,39(10):59-63
[8]王晓暾,熊伟.基于改进灰色预测模型的动态顾客需求分析[J].系统工程理论与实践,2010,30(8):1 380-1 388
基本信息:
DOI:10.14188/j.2095-6045.2015.05.013
中图分类号:TU433;N941.5
引用信息:
[1]覃劭峰,韩达光,徐进军,等.改进后的GOM(1,1)模型在基坑沉降预测中的应用[J],2015,40(05):46-48+51.DOI:10.14188/j.2095-6045.2015.05.013.
基金信息:
国家自然科学基金资助项目(41274021)